This modern logistics and distribution facility in Houston, TX required a foundation and slab system capable of supporting constant forklift traffic, heavy racking loads, and climate-sensitive operations. The Graphene Solution supplied next-generation graphene-enhanced concrete engineered for industrial-grade strength, crack resistance, and long-term environmental performance.

The GreenTech facility needed a floor system that could handle continuous mechanical stress without cracking, curling, or premature wear. Traditional concrete mixes often fail under such dynamic loads — leading to maintenance issues and costly downtime. Our team developed a graphene-based solution that offered fast curing, minimized shrinkage, and maintained surface precision critical for warehouse automation and high-traffic operations.
The mix also needed to meet Houston’s humidity and thermal expansion challenges. Our formulation delivered a flat, stable, and durable floor ready to handle industrial activity 24/7 — without the environmental toll of traditional high-cement mixes.


This graphene-enhanced solution provided a durable, long-lasting foundation for GreenTech’s high-volume distribution operations — built to meet both structural demand and sustainability goals.
By using graphene-enhanced concrete, this logistics center experienced a 30% reduction in curing time and a notable increase in surface strength. It allowed racking systems and equipment to be installed ahead of schedule while keeping thermal control systems stable.
GreenTech’s operations are now powered by a floor system that requires less maintenance, resists impact damage, and aligns with Houston’s growing clean-building movement. This project proved how advanced concrete can reduce downtime and deliver performance at scale.
logistics hub concrete, greentech houston, greentech, greentech logistics
logistics hub concrete, greentech houston, greentech, greentech logistics